Ops 571 final exam university of phoenix

Ops 571 final exam university of phoenix






Disclaimer: Answers are in the bold faced italic font.
1.Which of the following is considered a major process flow structure?
  • Lead Time
  • Fabrication
  • Lean Manufacturing
  • Project
2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
  • Certification is sought by any firm assuming they pay annual dues.
  • 2nd Party – where a customer audits its supplier
  • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
  • 1st Party – where a firm audits itself against ISO standards
3.Which of the following is ISO 14000 primarily concerned with?
  • Quality management
  • Time management
  • Continuous improvement management
  • Environmental management
4. Which is the one correct value stream principle?
  • Look for efficiencies in the factory, office, physical, procedural, and technical operations.
  • Eliminate waste that stops, slows down, or diverts the value stream.
  • Concentrate on speeding up value-adding operations rather than removing waste.
  • Keep the value stream moving at minimum velocity.
5. What is the starting point in developing a capacity plan for a health care operation?
  • Determining the effective capacity over time
  • Estimating design capacity
  • Forecasting patient demand for a reasonable length of time
  • Discovery of the bottleneck operation
6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
  • MRP (Material Requirements Plan)
  • ERP (Enterprise Resource Planning)
  • MPS (Master Production Schedule)
  • WBS (Work Breakdown Structure)
7.Which of the following is an element that addresses elimination of waste under lean production?
  • Kanban production control system
  • Production ahead of demand
  • Minimized run times
  • Group plant loading technology
8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
  • Level elements
  • Future elements
  • Past elements
  • Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:
  • Reducing product quality during the assembly process
  • Designing products so they can be manufactured by a virtual factory
  • Reducing equipment in the production process
  • Simplification of the product by reducing the number of separate parts
10. Which of the following is one of the principles of reengineering?
  • Quality at the source
  • Do not select suppliers on the basis of price alone.
  • Have those who use the output of a process perform the process.
  • Leverage high cost employees with lower cost employees.
11. Which of the following is a characteristic that can be used to guide the design of service systems?
  • Services are all similar.
  • Services businesses are inherently entrepreneurial.
  • Quality work means quality service.
  • Services cannot be inventoried.
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?
  • Risk hedging
  • Forward looking
  • Efficient
  • Agile
13. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's used to classify poka-yokes?
  • Trust
  • Teamwork
  • Task
  • Time
14. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?
  • The service package has the same legal protection available to manufactured goods.
  • Manufacturing is far more capital intensive than services.
  • The service process and service product can be developed independently.
  • The service package is the major output of the development process.
15. A project can be segmented into which of the following? 
  • Events
  • Sub-jobs
  • Work packages
  • Success markers
16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?
  • Statistical tools
  • Decision trees
  • Work sampling
  • Gap analysis
17. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?
  • Product design
  • Inoperable equipment
  • An employee
  • A customer
18. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:
  • Economies of shape
  • Economies of size
  • Economies of scale
  • Economies of scope
19. According to the theory of constraints, which of the following financial measurements can be used to measure the firm's ability to make money?
  • Operating expenses
  • Dividends
  • Sales
  • Return on investment     
20. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?
  • Continuous improvement
  • Control charting
  • Standard deviation
  • Project management
21. Which of the following is usually included as an inventory holding cost?
  • Order placing
  • Quantity discounts
  • Breakage
  • Typing up an order
22. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?
  • Blocking
  • Starving
  • Staging
  • Buffering
23. In a Gantt chart the vertical axis represents which of the following?
  • Time
  • Revenue
  • Tasks
  • Cost
24. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following: